Start Digging Hole
-

Hole Done, Install Ramp Board
-

Ramp Board and Back Board in Place
-

Ramp Board is at 45 Degrees, Back Board is Vertical but the Picture Distorts the Angle
-

Sliding Mounting Post into Hole Belayed by Rope Attached to Top
-

Mounting Post Near Bottom of Hole
-

Mounting Post in Hole and Now Preparing to Remove Ramp Board and Back Board
-

Mounting Post Vertically in Hole, 6 Feet Deep
-

Starting to Backfill Hole, Rope at Top is to Make Sure Post Didn’t Start to Tip Toward Ramp
-

Making Sure Post is Still Vertical While Backfilling Hole
-

Final Install, Looking Past Post Shows Where Antenna Will Come Down onto the Concrete Area for Maintenance
-

Backing up Cargo Trailer to the Mounting Post
-

Bolting Tower to Mounting Post
-

Lifting is Activated and the Cargo Trailer is Removed
-

Lifting Tower to Full Upright Position
-

Tower is Fully Upright
-

Tower Extended to Expose Rotor Plate at Top
-

Tower Extended to Full Height
-

Installing PVC Conduit Under Sidewalk to Run Cables Over to the House
-

Top View of Cable Conduit
-

Finished Conduit with Ground Coverings Replaced