    Start Digging Hole

  • slide

    Hole Done, Install Ramp Board

  • slide

    Ramp Board and Back Board in Place

  • slide

    Ramp Board is at 45 Degrees, Back Board is Vertical but the Picture Distorts the Angle

  • slide

    Sliding Mounting Post into Hole Belayed by Rope Attached to Top

  • slide

    Mounting Post Near Bottom of Hole

  • slide

    Mounting Post in Hole and Now Preparing to Remove Ramp Board and Back Board

  • slide

    Mounting Post Vertically in Hole, 6 Feet Deep

  • slide

    Starting to Backfill Hole, Rope at Top is to Make Sure Post Didn’t Start to Tip Toward Ramp

  • slide

    Making Sure Post is Still Vertical While Backfilling Hole

  • slide

    Final Install, Looking Past Post Shows Where Antenna Will Come Down onto the Concrete Area for Maintenance

  • slide

    Backing up Cargo Trailer to the Mounting Post

  • slide

    Bolting Tower to Mounting Post

  • slide

    Lifting is Activated and the Cargo Trailer is Removed

  • slide

    Lifting Tower to Full Upright Position

  • slide

    Tower is Fully Upright

  • slide

    Tower Extended to Expose Rotor Plate at Top

  • slide

    Tower Extended to Full Height

  • slide

    Installing PVC Conduit Under Sidewalk to Run Cables Over to the House

  • slide

    Top View of Cable Conduit

  • slide

    Finished Conduit with Ground Coverings Replaced